      By David Mak
      To effectively enhance awareness and gather opinions from the ICE members on hot topics concerning
      the construction industry or civil engineering, ICE HKA Public Voice Sub-committee organised two
      discussion forums in 2022 on the topics around innovation and climate crisis, which are the two most
      discussed topics among construction professionals nowadays.

      Held on 23 July 2022, the first discussion forum was titled ‘How to accelerate and mainstream
      innovation to uplift construction productivity?’. Adopting and integrating new technologies as
      well as the pursuit of innovation would have a positive impact on the Industry’s productivity levels.
      This breakfast forum attracted 33 participants on the importance of adopting innovations to enhance
      construction productivity and brainstorm the way forward.

      It was honoured to have Mr Joseph Lo, Principal
      Assistant Secretary of the Project Strategy and
      Governance Office of the Development Bureau
      to deliver an opening speech.  Mr Lo outlined the
 4-2  current situation of the Hong Kong construction
      industry, in the aspects of the forthcoming boost
      in persistent demand for construction services,
      the challenges arose from high construction costs
      and ageing labour force, the need of uplifting
      construction productivity, and the readiness of
      adoption of innovations in Hong Kong.  After
      the opening speech, an in-depth group and floor
      discussions session were conducted on four major
      aspects to uplift construction productivity in the
      industry:

         Topic 1 – Key obstacles and barriers encountered in practice for extensive application of innovative
        solutions or ground - breaking ideas in uplifting construction productivity and project performance.
         Topic 2 – Pain points in productivities for consultants and contractors.
         Topic 3 – Lessons learnt from pilot trials in moving the Industry forward to accelerate and
        mainstream innovation at scale, in either a revolutionary / disruptive manner or in an evolutionary
        manner.
         Topic 4 – Key areas that require re-engineering and restructuring for uplifting productivity apart